FormaShield.jpgLe système FormaShieldTM est une solution composite haute résistance, qui renforce la structure de la canalisation en contenant les charges circonférentielle et axiale. La résine époxy est renforcée par de la fibre de verre avec un tissage tri-axial qui peut être appliquée sur site, ce qui permet au système d'être adapté à des applications dans des environnements hostiles. Le système est détectable par inspection interne et répond aux normes ASME PCC-2 et ISO 24817.

Mechanical Properties

Attribute–Tensile Strength 
Method– ASTM D3039
Value– 74,000 psi

Attribute– Tensile Modulus 
Method– ASTM D3039
Value– 3.1 x 106 psi

AttributePoisson's Ratio
Method
ASTM D3039
Value– 0.37

Thermal Properties 

Attribute–Thermal Expansion 
Method– ASTM E831
Value–15.6 μm/m/C°

Attribute–Glass Transition Temp.
MethodASTM E1356
Value– 
105 °C

Attribute–Max Operating Temp.
MethodASME PCC-2
Value
85°C

Attribute–Application Temperature
Value55 °F to 120°F (13°C to 49°C)

System Properties

Attribute–Ply Thickness 
Value– 31 mils. (0.031 inches) 

Attribute–Working Time
Value40 minutes at Ambient

Attribute–Set Time
Value–2 hours

Attribute–Cure Time
Value–24 – 72 hours

Attribute–Shelf Life
Value1 year

Attribute–Available Widths
Value4, 6, and 12 inches

1.png1. Surface Preparation 

Remove all soft coatings and media blast the pipe to a 2.5 mil profile (NACE 3 minimum). Wipe the surface with a solvent such as Acetone, Toluene, or MEK.

 

 

2. Load Transfer filler 2.png

Mix the putty or paste until uniform in color and apply to any defects. Shape the filler to near net surface profile of pipe.

 

 

3.png3. Adhesive primer 
Mix equal parts of the adhesive primer until uniform. Apply the primer to the pipe surface, ensuring a minimum of 30-mil coverage. Allow the primer to sit until a “peanut butter” thickness is achieved. 

 

 

4. FormaShield Preparation 8.png
Mix epoxy parts A and B for at least 2 minutes. Apply the mixed resin onto the fabric evenly distribute on the fabric. Roll up the fabric and transfer to the prepared pipe.

 

 

5. Apply wrap to pipe 9.png

Apply cloth tightly around pipe and continue wrapping until designed layer count is achieved.
 

 

 

11.png6. Constrictor Wrap 
Tightly apply 4-6 layers of constrictor wrap over the repair. Then, perforate the surface of the wrap. Allow 2 hours for curing.

 

 

 

12.png7. Topcoat Application 
After the epoxy has cured, remove the constrictor wrap.  Apply a topcoat to the repair area, as applicable.

Click here to review the product data sheet. 

Pour plus d'informations sur ce produit.